tr4mpass/notes/future
tr4m0ryp adb0ec097b Initial project structure: design notes, architecture, and task breakdown
- Design notes covering two bypass paths (A5-A11 checkm8, A12+ session activation)
- Full architecture document with directory layout, data structures, control flow
- 14 task files for phased implementation across 6 parallel groups
- Future research notes for iOS 26.2+ (VU#346053 XML injection vector)
- Scope: iOS <= 26.1 for v1

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-05 01:48:34 +02:00
..
ios_26_2_plus_bypass.md Initial project structure: design notes, architecture, and task breakdown 2026-04-05 01:48:34 +02:00